Summer Projects - Discussed September 8, 2009

Summer Projects 2009

 

Cushing Community School

·        Painted front of school

Gilford Butler

·        Doors at lower level of building are scheduled to be replaced

·        Did not replace carpet in three classrooms as budgeted due to tile underneath the carpet containing asbestos

MacDougal

·        Chainlink fence is scheduled to be installed from existing playground fence to the building

Owls Head Central

·        A new boiler room floor drain was installed due to the old drain collapsing

RDMS

·        Window trim was replaced on several 2nd floor windows and the large bay window in the library

·        Carpet was replaced with VCT in the library

·        Floor was repaired in the hallway

South School

·        Window wall in the resource room was replaced with thermo pane panels

St. George School

·        Renovated the third of three classrooms in the original section of the building

·        Removed café dividing wall

·        Repaired and replaced outside trim

·        Bleachers were repaired and end rails were installed to make them code compliant

TGS

·        Café tables which were original equipment (1982) were replaced

·        Bleachers were repaired and end rails were installed to make them code compliant

GVHS

·        3rd phase of window replacement was done.  The front and rear of the building were the last two areas

·        Exterior siding was replaced on the front of the building with cement clapboard siding

·        Bleachers were  repaired and end rails were installed to make them code compliant

·        The roof of the library addition was not done, possibly going to be done in the spring dependent on budget at the time

Lura Libby   

·        Window trim around the front and end windows was replaced because of rot

RDHS

·        Resurfaceing of part of the parking lot was completed by the state

·        Additional local money was budgeted and all holes and bad areas of the parking lot were cut out and patches applied.  Reclaimed material was used to expand the hot top area of the parking lot.  The entire parking lot was re striped.

G&E Roofing completed a roofing survey of all roofs in the RSU.  The report will be presented to me on Thursday 9/10/09.